Envelope approach to improve sustainability and energy efficiency in existing multi-storey multi-owner residential buildings
Project Info

Grant Agreement ID: 285540 – FP7-NMP Programme

Start date: March 01, 2012

End date: February 29, 2016

Coordinator: RINA Consulting SpA

Partecipants: Politecnico di Milano, Ethnicon Metsovion Polytechnion, Eidgenossische Materialprufungs-und Forschungsanstalt, HALFEN Srl, Schwenk Putztechnik GmbH & Co. KG, RIDAN SP ZOO, S&B Industrial Minerals Mining Ouarrying Industrial Commercial Touristshipping Technical Company SA, Imprima Costruzioni Srl, Integrated Environmental Solution Limited, Stamtech Srl, Przedsiebiorstwo Robot Elewacyjnychfasada SP ZOO, Ancodarq SL, CIM-MES Projekt SP ZOO, Buildings Performance Insistute Europe ASBL, European Consortium of Anchors Producers, Magnetti Building SpA.

Project Description

EASEE aimd at developing a tool-kit for energy efficient envelope retrofitting of existing multi-storey and multi-owner buildings which combined novel design and assessment strategies, modular prefabricated elements, advanced insulating materials and new scaffolding-free installation approaches, to reduce energy demand, minimising the impact on occupants while preserving the façade original appearance.
Particularly, the project targeted residential buildings with cavity walls built before 70’s. These buildings require façade retrofitting for technical reasons or improvements in the insulation and energy efficiency to reduce the energy demand, while the conservation of the building appearance is necessary.
EASEE focused on the 3 main components of the envelope that influence the energy performance of multi-storey building, namely the outer façade, the cavity walls and the interior envelope, by developing innovative and easy to implement solutions. A new range of specific solutions have been developed within the project, that have been combined according to the characteristics of the building to be retrofitted as well as to other non technical parameters as for example cost and location of the building, also within the district.
The proposed approach allowed for an overall retrofitting cost over the whole life cycle and for a total cost of ownership up to 120 Euro/m2 allowing a return on investment below 7 years. EASEE reduced overall retrofitting duration and optimise the worksite in general with direct benefits for the workers and the occupants, while creating new business opportunities worth 4 BEuro in energy efficient retrofitting of existing buildings by the 5th year after project completion, mobilising new cooperation schemes between Les and local SMEs through licensing mechanisms. This is fully in line with the expected impact in the call and with the overall goal of the EeB PPP under the recovery plan pressing issue.